top of page
971718927340__edited.jpg

​Main house improvement & ADU

this project include main house improvement with new roof, new windows and door, new HVAC system, new kitchen and bathrooms, the main structure was built with block, it's hard to replace windows and run electrical wire and plumbing work.At back yard built 1200SF detached adu with 3bathrooms 2bathrooms and 1kitchen.

510.585.7388

742 charcot ave, San Jose  ca 95131 (North California)

​20803 valley blvd ste101, walnut ca 91789 (south california)

  • certified-wildfire-mitigation-specialist
  • MemberLogo202122_Fotor
  • Member_PPT_edited
  • Facebook
  • Twitter
  • LinkedIn

©2021 by Builtech Construction Group.

bottom of page