top of page
Search

Temporary tent avoid water flood during foundation work, and never stop work during raining day. 3weeks from demo until pour concrete at foundation.

  • aaronliuusa
  • Feb 20, 2024
  • 0 min read




 
 
 

Comments


510.585.7388

742 charcot ave, San Jose  ca 95131 (North California)

​20803 valley blvd ste101, walnut ca 91789 (south california)

  • certified-wildfire-mitigation-specialist
  • MemberLogo202122_Fotor
  • Member_PPT_edited
  • Facebook
  • Twitter
  • LinkedIn

©2021 by Builtech Construction Group.

bottom of page